Shade and light
Describe the times you use the space and whether you want fabric retraction, louvre-angle control or direct backwards roof retraction.
Compare the roof movementsHOMES & HOSPITALITY
Start with the way you want to use the space, then choose the roof movement and side opening. You do not need to know the product name before you contact us.
A home terrace and a restaurant terrace can use similar systems while needing different layouts, access arrangements and installation plans. Use the planning path that fits your project.


Plan the details
| What you want to change | System to explore | What to check |
|---|---|---|
| The fabric cover above the space | Motorised retractable PVC pergola | How the cover gathers and how the roof meets the building. |
| The angle of the louvres above you | Bioclimatic pergola | The louvre direction and demonstrated 105° sun-shading position. |
| The roof moving directly backwards | Rolling Roof | The collection area and remaining clear opening. |
| The vertical opening at the side | Motorised guillotine glass | Panel arrangement, collection direction and cleaning access. |
The way you use the space
Plan the area around the way you live in it: an outdoor dining table, a place to sit, a garden connection or a terrace beside a bedroom. Consider when sunlight reaches the space and how an added roof changes the view and daylight from inside.
Roof movement, privacy and side opening should be decided together. A layout that looks open in a photograph may use space for collected roof elements, glass panels or an entrance that you need to keep clear.
Describe the times you use the space and whether you want fabric retraction, louvre-angle control or direct backwards roof retraction.
Compare the roof movementsIdentify the sides that need screening or glass and the routes used to reach the garden, doors and windows. Keep everyday movement practical.
Review vertical-moving glassLeave safe access for cleaning the roof, drainage and both faces of the glass. Ask for the installed components and service responsibilities to be recorded.
Read the after-sales approach
The way you use the space
Plan the roof and sides around the operation of the business: guest seating, service routes, entrances, cleaning and access for maintenance. The product layout should support the way the area is run, including the positions used when the roof or glass is open.
Discuss installation stages, site readiness and any restrictions on working hours before agreeing a programme. Review the furniture layout and opening positions against the actual site, circulation and applicable local requirements.
Keep entrances and circulation clear in every intended roof and glass position. Coordinate furniture and service routes with the fixed supports.
Review the four systemsDecide who controls the systems, how the glass is cleaned and where a technician can safely reach the moving parts and drainage.
Review guillotine glass planningAgree the sequence, access conditions and checks with the project team. Keep delivery, installation and after-sales responsibilities visible in the written scope.
Read the delivery process
Layout and interfaces
A terrace project may combine a moving roof, glazing, screens and access doors. Decide what each edge needs to do before fixing the layout, so that supports, openings and junctions work together.
Guillotine glass opens vertically. Suitable sliding or folding glass uses different movement and collection space. Zip screens address shading and screening; they should not be treated as the same kind of enclosure as glass.
If the brief is an enclosed room with controlled temperature, assess the complete envelope, glass, frame details, ventilation and any cooling or heating equipment. A pergola and side glazing do not establish that result on their own.
Layout and interfaces
Sliding glass panels move horizontally along their tracks. This can be considered where you want an opening at the side of a terrace while keeping the panel movement within the planned track arrangement.
The proposed model determines the panel layout, tracks, collection positions and threshold details. Review the drawing with furniture, doors and cleaning access included, so that the open and closed positions work with everyday use.
Layout and interfaces
Folding glass uses a folding panel arrangement to open the side of the space. The panels collect in the parking position defined for the model and layout.
Assess the folding sequence and the parked panel group before placing furniture, supports or an entrance nearby. A photograph of the closed glass does not show the space needed while it opens or when it is fully parked.
Layout and interfaces
A zip screen uses fabric guided at its sides to shade and screen an opening. It can be considered alongside a pergola design when the brief includes side sun, glare or the view through the space.
Review the fabric sample, guide and cassette positions, control method and operating instructions for the proposed model. The view and degree of privacy depend on the fabric and lighting conditions, so day and night expectations should be discussed separately.
Layout and interfaces
A pivot door turns around its pivot axis. It addresses the entrance to a space and should be coordinated with the surrounding glass, threshold and the route people use.
Confirm the pivot position, intended opening movement, clear passage, glass and hardware for the proposed door. Leave the required movement space and review the threshold and operating forces with the project’s access requirements.
Plan the details
The term winter garden can describe different expectations. Explain whether you want a sheltered outdoor area or a room intended for controlled indoor conditions. That decision changes the roof, glass, frame and junction requirements.
For an enclosed-room brief, assess the full roof and wall construction, glazing, floor connection, drainage, ventilation and any heating or cooling system together. A moving pergola roof with glass sides does not establish the thermal performance of a complete room.
| Part of the brief | What needs to be defined |
|---|---|
| Use and comfort | The intended seasons and operating conditions, including any heating or cooling brief. |
| Complete envelope | The proposed roof, glass, frames, floor and building junctions. |
| Moisture and ventilation | Drainage, ventilation and the project-specific assessment of condensation. |
| Local requirements | Property approvals, structural assessment and any permissions applicable to the actual work. |
Plan the details
Choose the control method around the people using the space and the actual roof or glass model. Ask which remote controls, wall controls, sensors or connected-control options can be supplied, and confirm the selected arrangement in the quotation.
A sensor or connected controller has a defined job. Specify what it detects, which action it triggers and how the system is operated if power or communication is unavailable. Automation does not establish a wind, rain or other performance rating for the roof or glass system.
| Decision | What to confirm |
|---|---|
| Control method | The supported controller, the systems it operates and whether separate zones or individual operation are available. |
| Sensor response | The actual sensor function, trigger and response, documented operating limits and any manual-control procedure. |
| Site connection | The required electrical supply, cable route and connection work, with a named qualified party responsible for the site installation. |
| Connected control | The compatible interface, app or building-control connection, any network dependency and who sets up and maintains access. |
| Handover | The selected settings, operating instructions and a demonstration of the agreed controls and responses. |
Layout and interfaces
Plan lighting with the way the space is used, then check the fixtures and controls that can be supplied with the proposed system. The position of roof elements, collected panels, glass and furniture affects where light is useful and where glare may occur.
For a home or villa, discuss the light needed for dining, sitting and the route back indoors. For a café, restaurant or hotel, include guest circulation, table use and the working areas that need to remain practical after dark.
Specify the chosen fixture, mounting position, light colour, control method and any dimming or separate zones in the quotation. Their availability depends on the selected components. A photograph can show the appearance of a completed space; the technical specification defines the actual equipment.
Brief and delivery
For the first discussion, share the country and city, the type of space and what you want to change. Photographs and approximate dimensions are helpful if you already have them.
Before production, the project needs confirmed measurements, support and fixing details, drainage, power supply, the selected model and any local approvals. The responsible parties for these checks should be named in the proposal.
System selection
Local permissions, electrical work, structural preparation and after-sales arrangements should have a named owner. A complete project is easier to assess when these responsibilities are visible before the order is confirmed.
A supply proposal can be discussed with the person responsible for measurements, import handling, site preparation and installation. Confirm the drawings, documentation and support included in that proposal.
Review supply-only planningIf you need installation included, share the destination, access conditions and local project contacts. Availability and responsibilities are agreed for the actual job.
Review installation planningBefore you decide
A relevant project record explains the original use, why a particular mechanism was chosen and how supports, openings and site details were resolved. The most useful example is one that matches your requirements, not simply one with a similar colour.
Review approved project material and the company information, then send the brief for your own space.
QUESTIONS & ANSWERS
No. Describe the space and the opening you want. For example, you may want a fabric cover that retracts, louvres that change angle, a roof that moves directly backwards or glass that opens vertically. The product discussion can follow from that brief.
The same product family may be considered, but the layout and operating needs are different. A villa project may prioritise privacy and daylight; a restaurant project may place more weight on circulation, cleaning and installation stages. The actual design should follow the use.
Use the actual drawing to review fixed supports, open and collected system positions, entrances and service routes. Check the intended layout against the site and applicable local requirements. Any seating arrangement should be based on that assessment.
That needs a separate whole-space assessment. The roof, glazing, frames, junctions, ventilation and cooling equipment must be planned together. Adding a pergola and glass sides alone does not establish indoor thermal performance.
You can include their details in the project discussion. The proposal should state who confirms measurements, prepares or approves drawings, checks local requirements and completes installation. Only the coordination and technical support specifically agreed in the scope should be assumed.
Yes. Photographs and approximate dimensions are useful for the first discussion. Final production dimensions and the site conditions still need to be confirmed by the responsible technical party before manufacturing or supply is approved.
Compare the movement with the space available. Sliding panels move along tracks; folding panels collect in the model’s designated parking position. Review the clear opening, threshold, panel parking and cleaning access on the proposed drawing. The glass and hardware specification also need to match the intended use.
A zip screen provides fabric-based shading and screening. Glass is a different enclosure component. The choice depends on the opening, view and enclosure requirements, and the documented limits of the selected model. Review the fabric and the lighting conditions when discussing privacy.
The entrance can be discussed as part of the same layout. Confirm the pivot movement, clear passage, threshold, glass and hardware, then review the connection with adjoining panels. Applicable access and escape-route requirements need to be checked for the actual property.
It needs a defined use and a coordinated specification for the roof, glazing, frames, floor and building connections, drainage and ventilation. If the goal is controlled indoor conditions, the full envelope and any heating or cooling system must be assessed. The name winter garden alone does not establish insulation or year-round comfort.
Only the controls and components confirmed in the proposal are included. The selected model must support the proposed arrangement. Check the sensor function, response and operating limits, as well as any interface, network or setup requirements for connected control.
Lighting can be discussed with the project. Confirm the offered fixtures, positions, light colour and controls, together with the electrical connection and service access. The exact equipment and any dimming or separate zones belong in the written specification.

MEET YOUR MANUFACTURER
Pergola Viva combines 15 years of sector experience with 7 years in manufacturing pergola and glass systems in Antalya.
About our team and manufacturingRead our Google reviews